Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the hello-elementor domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/www/powersolutions.net.au/httpdocs/wp-includes/functions.php on line 6114
Isuzu – Power Solutions

Isuzu

An impressive, multi-stage demolition and construction project at Isuzu’s head office in Cannon Hill. Works were cleverly staged in and around this operating workplace, ensuring an undisrupted comms room connection critical for the client’s national sales network. The project saw a 100sqm expansion of the office, the installation of an entirely new CAT6A-UTP network to both floors and the installation of a stand-by generator with automatic transfer switch to back-up the critical communication network.